Panel Upgrade Cost in Los Angeles

Panel Upgrade Cost in Los Angeles — Free On-Site Estimate

Planning a panel upgrade Los Angeles for EVs or remodeling? We don’t post prices online—every home is different. Farashi Electric performs a professional EV load calculation, confirms permit & inspection steps, and then gives you a firm, written on-site quote. Sometimes a clean sub-panel upgrade solves it; when capacity truly demands it, a 200A panel upgrade is designed to pass inspection the first time. Most projects finish in 1 day after approval.

Online “average prices” ignore your home’s reality: service size, meter/main layout, grounding, conductor routes, and inspector expectations. Farashi Electric puts math and method first so you don’t overpay—or under-spec. We come to you, run a load calculation, check AHJ requirements, and hand you a clear scope, timeline, and firm quote.

How our estimate works (simple, on-site process)

  1. Quick discovery call (5–10 min) — Symptoms (trips, heat, buzzing), recent additions (EV/HVAC/ADU), panel location, parking access.
  2. On-site assessment — Panel condition, free spaces, labeling, grounding/bonding, meter-main arrangement, conduit/feeder routes, clearance.
  3. Professional load calculation — We size capacity for today and near-term plans (EV(s), kitchen, workshop tools, heat pump).
  4. Permit check (AHJ/LADBS) — Scope requirements, inspection windows, and any relocation/utility coordination.
  5. Written scope & firm quote — What’s included, what might vary, and a realistic 1-day cut-over target after approval.

Ready for a precise quote? Get a Free On-Site Estimate (24–48h)

What actually changes your final price 

  • Service size & utility touch — Staying at 100–125–150A vs moving to 200A; overhead vs underground feed; meter/main constraints.
  • Meter-main combo vs main breaker — Some LA homes benefit from a meter-main combo outdoors; others keep a separate main breaker. Layout drives parts, labor, and inspection flow.
  • Sub-panel work — A nearby sub-panel for garage/ADU reduces long runs, tidies circuits, and can avoid bigger service work.
  • Conductor routes & protection — Feeder length/paths, bushings/fittings, AFCI/GFCI where required, and labeling every circuit.
  • Grounding & bonding upgrades — Correct electrode system and bonds are must-pass items for inspectors.
  • Brand & availability — We install Siemens, Eaton, Square D (UL-listed). Lead-times can affect scheduling.

EV charging & estimates: math before metal

An EV is a steady, significant load—but not an automatic 200A mandate. We analyze continuous load, charging behavior, and diversity of your household loads. Your custom plan may be:

  • A dedicated Level-2 circuit (plug-in 14-50 or hardwired),
  • Managed charging (current limiting) to stay within capacity,
  • A sub-panel upgrade near the parking area to shorten runs and organize circuits,
  • Or a full service/panel upgrade when the numbers—and your goals—truly require it.
    Explore EV options here: Level 2 EV charger installation.

What’s included with a Farashi Electric quote 

  • Permit filing & inspection scheduling with your local AHJ (e.g., LADBS)
  • Clean, code-compliant installation (NEC + local code)
  • Circuit labeling & panel documentation for future maintenance
  • Site protection & full cleanup
  • Written warranty on workmanship and approved components

We also explain any optional add-ons (surge protection, dedicated circuits, relocation for clearances) so you can choose confidently.

Our Completed Panel Upgrade Projects​

Timeline & downtime

  • Most upgrades finish in 1 day after permit approval.
  • If utility coordination is required, we plan to minimize downtime and keep you in the loop.
  • You’ll know the sequence: protection → shutdown → cut-over → labeling → inspection → cleanup.

Case scopes

  • Encino (91316): 100A → EV-ready plan without full service change; managed charging + garage sub-panel; neat labeling; passed inspection smoothly.
  • Burbank: Panel relocation for clearance + 60A sub-panel for ADU; AFCI updates; clearly labeled circuits.
  • West Hollywood: Load calculation showed need for capacity; 200A upgrade with clean meter-main layout; hardwired Level-2 with cable management.

Ready for a precise, code-compliant estimate? We’ll run the numbers, file the permit, and complete most upgrades in 1 day after approval.

FAQs (straight answers)

We can outline factors, but the firm quote comes after on-site assessment and permit check—so you’re not paying for guesswork.

Not always. The load calculation tells the truth. Sometimes managed charging or a sub-panel upgrade is smarter.

Our goal is a same-day cut-over once the permit is approved.

Farashi Electric does—from filing to scheduling and day-of coordination.

Siemens, Eaton, Square D—UL-listed gear with reliable availability.

5/5 - (1 vote)

Leave a comment

Your email address will not be published. Required fields are marked *