Planning a panel upgrade Los Angeles for EVs or remodeling? We don’t post prices online—every home is different. Farashi Electric performs a professional EV load calculation, confirms permit & inspection steps, and then gives you a firm, written on-site quote. Sometimes a clean sub-panel upgrade solves it; when capacity truly demands it, a 200A panel upgrade is designed to pass inspection the first time. Most projects finish in 1 day after approval.
Online “average prices” ignore your home’s reality: service size, meter/main layout, grounding, conductor routes, and inspector expectations. Farashi Electric puts math and method first so you don’t overpay—or under-spec. We come to you, run a load calculation, check AHJ requirements, and hand you a clear scope, timeline, and firm quote.
Professional load calculation — We size capacity for today and near-term plans (EV(s), kitchen, workshop tools, heat pump).
Permit check (AHJ/LADBS) — Scope requirements, inspection windows, and any relocation/utility coordination.
Written scope & firm quote — What’s included, what might vary, and a realistic 1-day cut-over target after approval.
Ready for a precise quote? Get a Free On-Site Estimate (24–48h)
What actually changes your final price
Service size & utility touch — Staying at 100–125–150A vs moving to 200A; overhead vs underground feed; meter/main constraints.
Meter-main combo vs main breaker — Some LA homes benefit from a meter-main combo outdoors; others keep a separate main breaker. Layout drives parts, labor, and inspection flow.
Sub-panel work — A nearby sub-panel for garage/ADU reduces long runs, tidies circuits, and can avoid bigger service work.
Conductor routes & protection — Feeder length/paths, bushings/fittings, AFCI/GFCI where required, and labeling every circuit.
Grounding & bonding upgrades — Correct electrode system and bonds are must-pass items for inspectors.
Brand & availability — We install Siemens, Eaton, Square D (UL-listed). Lead-times can affect scheduling.
EV charging & estimates: math before metal
An EV is a steady, significant load—but not an automatic 200A mandate. We analyze continuous load, charging behavior, and diversity of your household loads. Your custom plan may be:
A dedicated Level-2 circuit (plug-in 14-50 or hardwired),
Managed charging (current limiting) to stay within capacity,
A sub-panel upgrade near the parking area to shorten runs and organize circuits,
Or a full service/panel upgrade when the numbers—and your goals—truly require it. Explore EV options here: Level 2 EV charger installation.
What’s included with a Farashi Electric quote
Permit filing & inspection scheduling with your local AHJ (e.g., LADBS)
Clean, code-compliant installation (NEC + local code)
Circuit labeling & panel documentation for future maintenance
Site protection & full cleanup
Written warranty on workmanship and approved components
We also explain any optional add-ons (surge protection, dedicated circuits, relocation for clearances) so you can choose confidently.
Our Completed Panel Upgrade Projects
Timeline & downtime
Most upgrades finish in 1 day after permit approval.
If utility coordination is required, we plan to minimize downtime and keep you in the loop.
Encino (91316): 100A → EV-ready plan without full service change; managed charging + garage sub-panel; neat labeling; passed inspection smoothly.
Burbank: Panel relocation for clearance + 60A sub-panel for ADU; AFCI updates; clearly labeled circuits.
West Hollywood: Load calculation showed need for capacity; 200A upgrade with clean meter-main layout; hardwired Level-2 with cable management.
If you’re comparing panel upgrade costs in Los Angeles and every quote feels like a guess, let Farashi Electric turn it into real numbers tied to your actual home. Share a few photos of your panel, meter, and service path (overhead or underground), plus any big loads you have or plan to add (EV, ADU, heat pump, spa), and we’ll run a proper load calculation, check AHJ/utility requirements, and give you a firm on-site quote in writing—not a vague “ballpark.”
Ready for a precise, code-compliant estimate? We’ll run the numbers, file the permit, and complete most upgrades in 1 day after approval.