We handle LADBS permits, run a professional load calculation (EV included), and finish most upgrades in 1 day after approval. Licensed & insured. Free on-site estimate — we come to you.

  • 1-day completion after permit
  • LADBS permit & inspection handled
  • EV-ready load calculation
  • Clean work & full cleanup
  • Labeled circuits & documentation

 

Nine Signs You Need a Panel Upgrade

Red Flag

Why It’s Serious

Breakers trip when the microwave and toaster run together

Indicates load > 80 % of panel rating

Flickering lights during AC start-up

Voltage drop from undersized feeder

Warm breaker face or buzzing

Loose lugs or degraded bus bar

Installing a hot tub, EV charger, or ADU

Each demands up to 60 amps

Aluminum branch wiring

Needs torque-checked lugs or copper pigtails

Federal Pacific, Zinsco, or split-bus panel

Documented fire history

Fewer than 10 spare breaker spaces

Limits future circuits

Panel older than 30 years

Out-of-date grounding & bonding

You still have screw-in fuses

Not NEC 2023 compliant

Pro tip: A service panel upgrade often qualifies for California’s Energy Smart Home Rebate—ask our staff to file the paperwork for you.

 Cost Drivers You Control

  1. Distance to meter: Each extra foot of 4/0 copper adds ~$6.
  2. Wall type: Stucco penetrations require patch & paint.
  3. Combo projects: Bundling EV Charger Installation in Los Angeles or landscape lighting in Los Angeles with the panel swap saves 10–15 % in labor.
  •  
electrical panel upgrade
Hidden Savings
    • Home-insurance discounts average 5 % for panels less than 20 years old (State Farm 2024 survey).
    • A Zillow study shows upgraded electrical boosts resale value by $2 per sq ft in Southern CA.

The Farashi Electric 7-Step Upgrade Process

  1. Load Calculation & IR Scan – We measure real-time amp draw and pinpoint hot spots.
  2. City Permit Pull – Paperwork, plan check, and LADWP coordination—handled in-house.
  3. Temporary Power Setup – Keeps your fridge and Wi-Fi alive.
  4. Old Panel Demolition – Safe asbestos & lead protocol for pre-1980 boxes.
  5. Install “Best Electrical Panel Upgrade” Components
    • 200-amp NEMA 3R main with copper bus, surge protector, AFCI/GFCI breakers.
    • For load-side interconnections, follow the current NEC section numbering adopted locally (e.g., 2020 NEC 705.12(B)(3); clarifications added in the 2023 edition). Your final configuration (bus rating, OCPD positions, sum of 125% inverter output + main OCPD ≤ 120% of bus) must satisfy your AHJ’s requirements.
  6. Grounding & Bonding – Dual 5/8-in copper rods + cold-water bond.
  7. Final Inspection & Clean-Up – White-glove service; we even label every circuit.

Need whole-home rewires? See our Wiring and Rewiring Services in Los Angeles page.

📞 Phone Number: (267) 248‑5496
Address: 5400 Newcastle Avenue Encino ca 91316

Need a Safe, Code-Compliant Panel Upgrade?

Dedicated 200A/400A service upgrades, clean labeling, permits & final inspection handled.

Call (267) 248-5496

Pricing & Estimates (Los Angeles)

Upfront pricing after load calculation & permit check — Free on-site estimate.
Every home is different. We inspect the existing service, calculate load (EV, HVAC, appliances), and confirm permit requirements before giving a firm quote.

Typical timeline: most panel upgrades are completed in 1 day after permit approval.

What drives the price?

  • Service size & utility work (100A → 200A, overhead vs. underground)
  • Meter-main combo vs. separate meter + main breaker
  • Feeder runs, sub-panel additions, new circuits, AFCI/GFCI requirements
  • Trenching/conduit, grounding & bonding upgrades
  • Panel brand/space (Siemens, Eaton, Square D), copper vs. aluminum conductors
  • Permit & inspection scope (LADBS / local AHJ)

What’s included with Farashi Electric

  • Permit handling & inspection scheduling
  • Clean, code-compliant installation (NEC + local code)
  • Labeling every circuit and panel documentation
  • Site protection & full cleanup
  • Written warranty on workmanship and parts (brand-backed)

Get a Free On-Site Estimate (24–48h)Or Send Photos of Your Panel for a quick pre-assessment.

Sample Case Studies

Encino (91316): 100A to 200A upgrade, EV-ready; new grounding, GFCI/AFCI updates. Passed inspection same day.

  • Burbank: Meter-main combo replacement + relocation to meet clearance; added 60A sub-panel for ADU.
  • West Hollywood: Service upgrade with load calc for Tesla Wall Connector; existing sub-panel re-terminated and labeled.

Specs That Define the Best Electrical Panel Upgrade

FeatureWhy It Matters
Copper Bus Bar40 % cooler under identical load than aluminum.
40+ SpacesAccommodates battery storage inverter + heat pump.
Integrated Surge ProtectionShields $5K worth of electronics for <$200.
Smart BreakersApp visibility, energy monitoring, remote shut-off.
Load Shedding ModuleAutomatically prioritizes HVAC over EV charging.

Future-Proofing Checklist

  • Ask for spare conduit to garage for electrical panel upgrade near me solar and EV expansion.
  • Specify 4/0 copper service entrance conductors for up-to-300-amp readiness.
  • Opt for combo meter-main to save wall space.

Beyond the Main Panel—Bundle & Save

A residential electrical panel upgrade is the perfect moment to add complementary projects and other electrical services in LA:

  • EV Charger Installation in Los Angeles – Up to 30 % federal tax credit.
  • Landscape lighting in Los Angeles – Low-voltage transformers fit neatly beside the new panel.
  • Electrical troubleshooting in Los Angeles – We diagnose historic knob-and-tube circuits before reconnecting them.

Combined visits cut truck-roll fees and fast-track LADWP green-power incentives.

Rebates & Permits

Electrical permits are required in the City of Los Angeles. Many residential panel replacements proceed via express/counter permits; complex scopes may require plan review. Always verify with your Authority Having Jurisdiction (AHJ) and schedule a final inspection before energizing.

See: LADBS Electrical Permits and Plan Review & Permitting pages.


A safe, future-ready electrical system starts with a panel upgrade engineered for today’s code and tomorrow’s tech. By partnering with farashi electric, you lock in transparent pricing, five-year workmanship warranty, and white-glove customer care recognized across electrical services in LA. Ready to power up? Click the button below for a free, same-day virtual walk-through—or share this guide with a neighbor who still has a creaky fuse box. Let’s spark a safer Los Angeles together!

Our Completed Panel Upgrade Projects

Our Coverage Across Los Angeles
What Our Clients Say
Panel Upgrade FAQ: Common Questions & Expert Answers

A replacement swaps like-for-like ampacity; an upgrade increases capacity and spaces.

California requires a C-10 license for contractors performing electrical work for hire. Owner-builders in some jurisdictions may perform certain work on their own homes with permits and inspection. For safety and compliance—especially with service equipment—most homeowners choose a licensed C-10. Check your City of LA / LA County rules first.

Typical outage is 4–6 hours; we schedule around your family’s routine.

No. Ampacity is capacity, not consumption. Your usage habits drive the bill.

Farashi Electric secure permits in 3 business days and schedule installs within two weeks city-wide.

Yes. On-site estimate and load calculation are free in our service area.

No—our goal is same-day cut-over. If utility coordination is needed, we plan to minimize downtime.